Share VMware 3V0-624 exam practice questions and answers from Lead4Pass latest updated 3V0-624 dumps free of charge.
Get the latest uploaded 3V0-624 dumps pdf from google driver online. To get the full VMware 3V0-624 dumps PDF or dumps
VCE visit: https://www.leads4pass.com/3v0-624.html (Q&As: 142). all VMware 3V0-624 exam questions have been updated, the answer has been corrected!
Make sure your exam questions are real and effective to help you pass your first exam!

[VMware 3V0-624 Dumps pdf] Latest VMware 3V0-624 Dumps PDF collected by Lead4pass Google Drive:
https://drive.google.com/file/d/1VHXYjJJrBX-eb9bJ8zYGHAtfsT2DMOA2/

[VMware 3V0-624 Youtube] VMware 3V0-624 exam questions and answers are shared free of charge from Youtube watching uploads from Lead4pass

https://youtube.com/watch?v=0cZB4O9KeKA

Latest Update VMware 3V0-624 Exam Practice Questions and Answers Online Test

QUESTION 1
A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
1.
The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the
developers and one for every QA project.
2.
The proposed configuration will allow each developer to work independently and be able to collapse and re-create the
environment as needed.
3.
QA Teams will be able to recreate the environment that is required for a specific application.
4.
Individual virtual machines in the blueprint are being continually updated with newly available software packages.
5.
The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
A. EE and Bermuda libraries that are backed by an NFS file system.
B. EE and Bermuda vCenter Servers with Enhanced Linked Mode.
C. FTP protocol to transfer data between published in EE and subscribed in Bermuda libraries.
D. Published library in EE backed by an NFS file system while subscribed library in Bermuda is backed up by datastore.
E. A minimum 10 GbE connection between EE published and Bermuda subscribed libraries is required.
F. EE and Bermuda vCenter Servers without Enhanced Linked Mode.
Correct Answer: ABDF
You can eliminate C and E as FTP isn\\’t supported natively and without more information there is no need for a 10GbE
connection. 1GbE may suffice. Not to mention a 10GbE connection between EE and Bermuda would be nearly
impossible and if it even is that would be completely cost-prohibitive. At that point it\\’s cheaper to move your entire QA
team to EE ?or even better, move your whole operation to Bermuda.
10Gbps is not a requirement, and you can only store the items either on VMFS or NFS: https://pubs.vmware.com/vsphe
re-6-5/index.jsp?topic=%2Fcom.vmware.vapi.progguide.doc%2FGUID-0B234875-EEEB-4982-9FC1-4DE6B071BDC9.h
tmlGreat link provided by Megalodon.

 

QUESTION 2
A company is consolidating its environment into vSphere 6.5, and uses a Fibre Channel SAN array to host a virtual
machines.
1.
It has a pair of MSCS clustered VMs with shared RDM.
2.
High availability of service is its top priority.
3.
It wants to ensure that performance is optimized for the cluster service. The design requirements are:
1.
Storage should be able to withstand at least one component failure.
2.
Each server has at least 2 ports for FC connections.
3.
MSCS should also have no single point of failure with the clustering service. Which design will meet these
requirements?[2021.1] lead4pass 3V0-624 practice test q2

A. Exhibit A
B. Exhibit B
C. Exhibit C
D. Exhibit D
Correct Answer: B


QUESTION 3
A university is going through an IT transformation project and is re-evaluating how to use technology to provide a better
academic experience for its 15,000 students. The university is a current VMware customer and has a single data
center.
1.
Within that data center, the university is using blade servers backed by a Fibre Channel array for its business-critical
applications
2.
It has two iSCSI arrays (one for the development environment and the other for the no-critical production environment)
3.
The university\\’s VMware environment consists of three clusters. The first cluster contains all development virtual
machines (VMs), the second cluster is dedicated to DMZ VMs, and the final cluster contains production VMs
4.
The university requires the ability to perform hardware maintenance without a service interruption, and can only sustain
4 minutes of downtime per month
From the list below, which three are constraints? (Choose three.)
A. 99.9% uptime is required for the environment
B. The Network Operation Center uses SolarWinds for all monitoring and alerting
C. Blade servers must be used to consolidate space
D. Provide capacity to support 20% Year-over-Year growth for the next 3 years
E. There area current contracts in place with Dell to provide all server hardware
Correct Answer: BCE

 

QUESTION 4
A company has a cluster consisting of 72GHZ of processor resources and has these requirements:
1.
Virtual machines in the Production pool must run without contention of any CPU resources with the other pools, while
Development and QA VMs do NOT share this restriction.
2.
QA VMs are considered the least important in this environment.
Which resource pool design would achieve the company\\’s need without introducing unnecessary contention?[2021.1] lead4pass 3V0-624 practice test q4

A. Exhibit A
B. Exhibit B
C. Exhibit C
D. Exhibit D
Correct Answer: A

 

QUESTION 5
An architect is planning a vCenter 6.5 solution that requires the virtual machine to run Windows 2012 R2 as the
operating system.
1.
The solution should provide a single management interface for all of the vCenter Server installs.
2.
The architect is concerned that the organization\\’s primary Oracle database server is NOT available at all of the sites
where a vCenter Server will be installed and will NOT be included as an option in the design. Which two database
solutions are valid options in the design document? (Choose two.)
A. Microsoft SQL Server on a dedicated virtual machine
B. MySQL embedded with vCenter Server
C. PostgreSQL on a dedicated virtual machine
D. VMware embedded PostgreSQL with vCenter Server
Correct Answer: AD
https://docs.vmware.com/en/VMwarevSphere/6.5/com.vmware.vsphere.install.doc/GUID-2F1D0E79-52C4-4DC2-AF01-11564207FBE1.html

 

QUESTION 6
A solution architect has finished conducting interviews and gathering requirements for a company and has determined
that the logical requirements are:
1.
two data centers for high availability
2.
synchronous replication to meet the zero minute RPO
3.
separating management workloads from application workloads
4.
dedicated 10Gb uplink for each low latency server
5.
single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)
A. Configure 1 Port Group with a dedicated 10Gb Uplink for low latency servers.
B. Deploy two clusters, one for management workloads and one for application workloads.
C. Build 2 Port Groups, one for management services and one for application servers.
D. Install two vCenter Servers in Enhanced Link Mode.
Correct Answer: AC

 

QUESTION 7
A solution architect has been tasked with designing a new environment that meets the growing needs of a company,
and as obtained this information:
1.
Each new server will use a single 2-port 10Gb Converged Network Adapter (CNA) for both network and storage
access.
2.
The network team has replaced all network equipment with a 10Gb fabric.
3.
The new environment will host both web servers and Oracle database servers.
4.
Resources will not be overcommitted under regular operations to mitigate performance issues.
5.
The business needs a tool to understand application failures.
6.
$1million has been budgeted for the data center expansion project.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
A. The Converged Network Adapters may not be able to support both network and storage throughput.
B. The Converged Network Adapters are compatible with vSphere 6.5.
C. The Oracle database servers are configured for high availability.
D. The total project costs may be over budget due to not overcommitting resources.
Correct Answer: AD

 

QUESTION 8
A customer has requested a high availability option for its data center in the event of a power failure and the loss of
connectivity to a virtual machine. Which three vSphere features support fault tolerance? (Choose three.)
A. HA
B. Virtual volume datastore
C. vMotion
D. Storage-based policy management
E. DRS
F. Virtual machine snapshots
Correct Answer: ACE
A, C, E are correct as in fact, they are cluster requirements for FT
https://docs.vmware.com/en/VMware-vSphere/6.5/com.vmware.vsphere.avail.doc/GUID-83FE5A45-8260-436BA603-B8CBD2A1A611.htmlE is partially correct as well, as “You can use vSphere Fault Tolerance with DRS only when
the EVC feature is enabled. This process allows fault-tolerant virtual machines to benefit from better initial placement.” h
ttps://docs.vmware.com/en/VMware-vSphere/6.5/com.vmware.vsphere.avail.doc/GUID-59EA59EBC60F-4815-AE2E-7A38506C516C.html

 

QUESTION 9
A company is implementing a new vSphere 6.5 environment in order to virtualize one of its business-critical
applications.
1.
The existing data center equipment is over five years old and the operating system for most of the virtual machines will
be end-of-life next quarter.
2.
The database servers are physical and are also over 5 years old.
3.
The 12 current application virtual machines are configured with two vCPUs, 16GB of memory, and 60GB of storage
each.
4.
The database administrator states that the 16 existing database servers are quad-socket systems with 64 logical
processors, 256GB of memory, and a total of 230TB of storage in use.
5.
The system administrator insists that the new virtual machines must be the same size.
In this scenario, which option is a non-functional application requirement?
A. The operating system must also be upgraded.
B. The storage array must have more than 230TB of high-performance storage.
C. The ESXi hosts must have 64+ logical processors and 1TB of memory.
D. The application virtual machines must be configured with two vCPUs, 16GB of memory, and 60GB of storage.
Correct Answer: D

 

QUESTION 10
A company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment.
Currently, the infrastructure contains:
1.
server with 2 x 8 cores CPUs and 96G8 of memory
2.
backup LAN with a single physical switch
3.
production LAN
4.
sufficient datastore performance as determined by the storage team
Match the existing infrastructure component to its appropriate concept.
Select and Place:[2021.1] lead4pass 3V0-624 practice test q10

 

QUESTION 11
A company is a leading provider for an online travel booking system with over a $1,000,000 turnover each day. The company warns to leverage VMware cloud solutions to consolidate, scale, and ensure high availability for all of its data
centers. Match each business requirement to its appropriate design concept.
Select and Place:
[2021.1] lead4pass 3V0-624 practice test q11

Correct Answer:

[2021.1] lead4pass 3V0-624 practice test q11-1

 

QUESTION 12
A customer wants to make its data available with an RPO of 10 minutes. Replication to the second data center will be
done using the network.
Which type of storage configuration should be used?
A. NFS datastore on ESXi 6.0 with vSphere replication appliance 6.0
B. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.5
C. vSAN datastore on ESXi 6.0 with vSphere replication appliance 6.5
D. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.0
Correct Answer: C
vSphere Replication 6.5 is supported on previous ESXi versions (such as 6.0). The only constraint is vCenter is running 6.5
as well (which can be assumed as it is not mentioned). vSphere Replication 6.5 release notes announce the 5 minute
RPO (improved from 15 minutes previously) and specifically calls out the limitation of ESXi 6.0 only being supported for
vSAN.
https://docs.vmware.com/en/vSphere-Replication/6.5/rn/vsphere-replication-65-release-notes.html
1.
5-minute Recovery Point Objective (RPO) support for additional data store types

 

QUESTION 13
Categorize the tools as providing either Availability or Recoverability.
Select and Place:[2021.1] lead4pass 3V0-624 practice test q13

Correct Answer:

[2021.1] lead4pass 3V0-624 practice test q13-1


For the full VMware 3V0-624 exam dumps from Lead4pass 3V0-624 Dumps pdf or Dumps VCE visit: https://www.leads4pass.com/3v0-624.html (Q&As: 142 dumps)

ps.
Get free VMware 3V0-624 dumps PDF online: https://drive.google.com/file/d/1VHXYjJJrBX-eb9bJ8zYGHAtfsT2DMOA2/